Shed Repair
Date
April 10th, 11th 2025
Customers back wall of the shed had a lot of water damage. When taking off the wall found that the header joists of the floor on that side also had water damage and had dropped down some. We need to jack up the back of the shed so we could install new 2x8 header joists. Once those were installed we went through and checked all the wall studs and ended up needing to add some support on 2 of them to prevent any issues in the future. Installed the 3/4 plywood panels and covered the seems with 1x3's. Customer just needed the back wall repaired for now as they plan on replacing the whole shed in the future.